All contractors in the city are required to conduct closed-circuit television (CCTV) inspections of its sewer lines ahead of and just after finishing any utility set up projects to mitigate the risk of cross bores Often,“electrical cooperatives will set the meter with a pole, and also the provider to the https://fireflylisting.com/listings/util-locate