As witnessed from the figure beneath, continual auger is used to drill the borehole, lift up drilled soil, and pour concrete even though the auger is moved up. Consequently, the borehole doesn't will need casing or hydrostatic strain to forestall harm to the borehole wall. Log in to TheConstructor to https://cast-in-situ-piles-in-ban96924.ltfblog.com/31857261/5-tips-about-cast-in-situ-piles-you-can-use-today