The 25mm thick significant metal tube is driven While using the finish closed by a steel shoe. On achieving the expected driving resistance, a full duration cage is lowered in towards the tube and stuffed with large slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://frankh554xma0.wikitron.com/user