Objective As the sand layer located at the launching end of the slurry shield section is connected with seawater during the tunnel construction of Xiamen Metro Line 3. accidents like water and mud gushing. ground collapse may occur when the shield starts. Therefore. https://www.drcristinosuarez.com/