Project Summary At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the noteworthy realisation of the project. Designed to strengthen ESG targets, the installation enhances process efficiency while lowering overall energy usage and CO₂ discharge. https://esocialmall.com/story6168655/high-efficiency-400-kw-chiller-installation-secures-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving